logo cbt
Artigos

100 Year Durability Sprayed Concrete AlpTransit Gotthard Base Tunnel

Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can offer. Cement producers and concrete admixture manufacturers have been challenged to design and test jointly concrete systems for cast and sprayed concrete. The testing operation followed the scenario laid out by the Gotthard AlpTransit Project management’s instructions “Testing system for concrete mixes”. Various supplier teams have applied for the concrete systems for sections Amsteg/Erstfeld, section Sedrun and/or sections Bodio/Faido and have also followed through with the tests. As was to be expected, the rate of failed mixes matched the level of the requirements. Thanks to this system, it was nevertheless possible to test complete concrete systems for all sections and to get them approved. The joint ventures tendering for the contracts were allowed to include only approved mix designs in their bids. Workability and durability are of paramount importance for cast and sprayed concrete mixes. Durability is influenced by the chosen mix design where binder concept and well-defined water content, i.e. impermeability, are determinant. Aggregates for AlpTransit are to be considered as given. The concrete mix design also determines workability. Because ambient conditions and also requirements with respect to workability are subjected to change, it is necessary that the mix designs include control measures. The choice and number of components for the concrete systems (cement, additives and admixtures) allow adaptation to changing conditions. For AlpTransit such adaptive measures must meet very strict requirements.


Jürg Schlumpf

Clique aqui para baixar o PDF do artigo

Esse post foi publicado de terça-feira, 19 de maio de 2009 às 23:27, e arquivado em Artigos. Você pode acompanhar os comentários desse post através do feed RSS 2.0. Comentários e pings estão fechados no momento.

Comments are closed.

logo cbt SÓCIOS COLETIVOS
MetrôCPBFundsoloGraceodebrechtSikaBasfMACCAFERRI DO BRASIL LTDA  HerrenknechtCemigSANDVIK MINING AND CONSTRUCTION DO BRASIL S/ANovatecnaIncotep Ind. e Com. de Tubos Especiais de Precisão LtdaCamargo CorrêasolotratAndrade gutierrezSetepla Tecnometal Engenharia LtdaCONSTRUTORA OAS LTDABrasfond Fundacoes Especiais S/A